Pre-Forming Tools

Supplied by Tubing Supply · Produced by BMT Superlok · Tooling reference

Production tooling

Manual and automatic Pre-Forming tooling

Pre-Forming tooling is used to work-harden the tube end before assembly with the BMT-patented Pre-Forming fitting. Manual and automatic tool variants are described in the Pre-Forming Fitting catalog.

Tooling is documented inside the Pre-Forming Fitting catalog

Manual and automatic Pre-Forming tools are described in the Pre-Forming Fitting catalog alongside the connection, assembly and ordering data. Selection and tooling requirements depend on tube material, OD and wall thickness — confirm against the catalog before specifying connections.

  • Manual Pre-Forming tool option
  • Automatic Pre-Forming tool option
  • Used in conjunction with the Pre-Forming Fitting catalog
  • Confirm tube material, OD and wall against the Pre-Forming catalog
Selection note. Pre-Forming tooling must match the tube material, OD and wall thickness specified in the Pre-Forming Fitting catalog. Confirm tooling availability before specifying Pre-Forming connections.

Reference

Applications & selection guide

Where it sits in the system

  • Pre-Forming tube-end preparation
  • Field assembly of Pre-Forming connections
  • Workshop fabrication of Pre-Forming tube ends

Typical systems & markets

  • Oil & Gas
  • Hydrogen and clean energy
  • Hydraulic systems
  • Test and measurement

Selection reason

  • Manual tool for field assembly
  • Automatic tool for repeatable workshop assembly
  • Compatible with the BMT-patented Pre-Forming fitting
  • Pre-Forming process is part of catalog assembly conditions

Need help selecting the right configuration?