Everything you need to specify, install, and maintain instrumentation tubing systems. CAD files, compliance certificates, installation guides, and engineering calculators.
Searchable 2D/3D Models
Download production-ready CAD files for every product in our catalog. STEP, IGES, and 2D PDF formats available.
Certificates & Approvals
Access EC-79, NORSOK M-650, DNV-GL, and TUV Nord certifications. Full material traceability documentation.
Video Guides & Manuals
Step-by-step installation guides for i-Fitting systems and Pre-form bending tools. Expert techniques in under 5 minutes.
Interactive Tools
Calculate Cv values, pressure ratings, and temperature derating factors. ASME B31.3 compliant calculations.
Why leading contractors are switching from Cone & Thread
| Factor | Pre-form / i-Fitting | Cone & Thread (Legacy) | Improvement |
|---|---|---|---|
| Installation Time | 2-3 min/joint | 15-20 min/joint | 85% faster |
| Leak Risk | Near zero | Thread sealant dependent | Eliminated |
| Rework Rate | <0.1% | 3-5% | 98% reduction |
| Training Required | 2 hours | 2-3 days | 90% less |
| Tool Investment | Standard wrenches | Thread cutting equipment | Minimal |
| H2 Compatibility | TUV Nord certified | Not recommended | Future-proof |